Hello there.
I have a little bit of a concern that I need to deal with.
We have a design department and an engineering department.
The Design department works on the design then the engineering department imports the design drawings into their drawings and starts to develop the products. There are two main issues going on here;
1) Design uses annotative scaling engineering does not (But Eng. is going in that direction)
2) Design's LTS = 1 engineering LTS = 10 (this is my current dilemma)
Today's concern deals with whether or not I change the default LTS of the engineering department to 1 or not.
This is the way I see it;
If I do that, I will need to change the object LTS of any line that is not continuous in all of the engineering product templates and possibly any previous drawing that may be relevant to the near future.
Wow! just typing that tells me I do not want to tackle this in this manner.
So, has anyone else had to tackle this type of scenario?
Is there a good solution for this?
Possibly something that I am not thinking about?
Thank you in advance for any suggestions.